Page 1 of 1

What is the old infrastructure cut-off period for my location?

Posted: Mon Apr 29, 2019 4:01 pm
by Franpa
What is the old infrastructure cut-off period for my location? for the last 2 or 3 weeks we've been getting phone calls from things that claim to be involved with the NBN that talk about the infrastructure switch-over. Obviously those phone calls are attempts at scamming us but the timing of them has me curious about how close we actually are to the switch over period (I'm already on the NBN).

Re: What is the old infrastructure cut-off period for my location?

Posted: Mon Apr 29, 2019 7:00 pm
by James
Normally 18 months after NBN is ready.

Re: What is the old infrastructure cut-off period for my location?

Posted: Fri May 10, 2019 3:39 pm
by Franpa
James wrote:
Mon Apr 29, 2019 7:00 pm
Normally 18 months after NBN is ready.
No, I mean can I have a specific date? We moved in to an area that already had the NBN so I don't know when the NBN rolled out in this area.

(I also don't know why I made this topic in the ADSL forum)

Re: What is the old infrastructure cut-off period for my location?

Posted: Fri May 10, 2019 5:12 pm
by James
NBNs website has this for each address.

Re: What is the old infrastructure cut-off period for my location?

Posted: Sat May 18, 2019 2:51 pm
by Franpa
Ooh I found it, thank you.